Approvals, NOCs and technical drawings in Dubai

Documents are part of the build
Most renovation delays in Dubai are about paperwork, not construction. KVYS BUILDING CONTRACTING L.L.C prepares the drawings and handles the submissions for the projects it builds. The client does not have to manage a separate designer, MEP consultant and approvals agent. Where an authority requires a submission through a registered engineering consultant, KVYS arranges it.
What we prepare
- Design packages: existing and proposed layouts, elevations, sections, reflected ceiling plans and finishes schedules.
- MEP shop drawings: electrical layouts and load schedules, plumbing and drainage, HVAC and ventilation, coordinated with the architectural and joinery drawings.
- Fire-fighting and fire alarm drawings: prepared for submission to Dubai Civil Defence where the scope requires them. Installation and testing of fire systems is carried out by appropriately approved parties as the authority requires.
- Joinery and furniture shop drawings: made by our own production team, so built-in items fit the services behind them.
Who we submit to
Depending on the property and the scope, submissions can include:
- Master developers: NOCs from Emaar, Nakheel and other developers for villa and community works.
- Building management: work permits for apartment renovations.
- Dubai Municipality: building permits and modification approvals.
- Trakhees: permits for plots under its jurisdiction.
- DEWA: changes to electrical load and connections.
- Dubai Civil Defence: fire safety drawings.
Which authorities apply depends on the plot's jurisdiction, the community and the works proposed. We confirm this at the start of every project.
How it runs
- Site visit and review of existing drawings, title documents and community guidelines.
- Design is agreed with the client.
- Technical and MEP drawings are prepared to the relevant authority requirements.
- Submissions are made, comments are answered and drawings are revised until approved.
- Work starts once the required approvals are in place. Inspections are coordinated during and after the works.
Clients can follow approval status, budget and stages in the KVYS client portal.
Projects where approvals were part of the scope
- Burj Khalifa apartment: full renovation and authority approvals for a change from three bedrooms to two.
- Shubyua Japanese restaurant: approvals coordinated for a commercial fit-out.
- Emaar Square offices: a full floor of more than 2,000 sqm, split into 11 Grade A offices for an investor.
FAQ
Does KVYS handle NOCs and permits for clients?
Yes. KVYS prepares the drawings and handles submissions to master developers, building management and Dubai authorities for the projects it designs and builds.
How long do approvals take in Dubai?
It depends on the scope, the authority and the community. Cosmetic works may need only a work permit. Structural, facade or MEP changes take longer and can involve several authorities.
Can you prepare drawings only, without building?
No. KVYS prepares design, technical drawings and approvals only for projects it builds itself, so the drawings, the approvals and the works stay with one responsible contractor.