How a bespoke kitchen is made, from brief to installation

The short answer
A bespoke kitchen goes through six stages: brief, site measurement, visualisation, shop drawings, production and installation. The stage most often missed is coordinating plumbing, drainage, power and extraction before walls and floors are closed.
1. Brief
How you cook, how many people use the kitchen, which appliances you want, and whether the kitchen opens to the living area. Appliance choice comes first, because it fixes the dimensions, power and ventilation needs.
2. Measurement
The space is measured on site. In a renovation, a first measurement guides the design. The final check is made once walls and ceilings are built.
3. Visualisation
Layout, elevations and 3D views show proportions, materials and lighting before anything is ordered.
4. Shop drawings
Production drawings show every unit, front, cut-out and appliance housing, with exact positions for water, drains, sockets, dedicated circuits, lighting feeds and the extraction duct. The client approves them before production starts.
5. Coordinating MEP before walls close
This is where most kitchen problems start. Before plastering and screed:
- water and drain points are set to the shop drawings
- an island sink's drain is laid in the screed with the correct fall
- dedicated circuits for oven, hob and other appliances are installed
- the extraction duct route to outside is confirmed
- lighting feeds for under-cabinet and shelf lighting are placed
6. Production and installation
Units are made in production while site works continue. Stone worktops are templated once base units are installed, then fabricated and fitted. Appliances, lighting and final adjustments follow.
KVYS kitchens
- Arabian Ranches Villa 4: a statement kitchen in an enlarged kitchen-living area.
- Beach Mansion, Dubai Harbour: a kitchen island with an integrated dining table and fluted stone.
FAQ
When should a bespoke kitchen be designed in a renovation?
At the design stage, before MEP works start, so services are installed to the kitchen drawings.
Why are stone worktops measured after the units are installed?
Templating on installed units gives exact dimensions for joints, cut-outs and wall tolerances.
How long does a bespoke kitchen take?
It depends on the design, materials and appliance lead times. Production time is confirmed after the shop drawings are approved.
Does KVYS make its own kitchens?
Yes. KVYS designs, produces and installs bespoke kitchens in its own production.